ABOUT THE PROJECT

The challenge

Site leveling and drilling holes for piles on a steep hillside section.

The solution

This was a bare, over-grown section on a steep hillside with no access-way in place. Before site-leveling and drilling could commence, a temporary driveway needed to be carefully excavated along the hillside. The video shows excavation of the hillside and drilling holes for the piles.

Check out our other work

Call Mike now